FA

Pelletizing Plant

Pelletizing Plant

The pelletizing plant of Pasargad Alloyed Steel Industries was established in 2020 with a nominal capacity of 3.4 million tons per year using by ALICE Chalmers process. The iron ore concentrate is mixed according to the defined charging regime and increase blain number through HPGR. Bentonite and lime are added to increase the mechanical strength and metallurgical properties of the pellets. Produced pellets exit the disk after reaching the desired size and are transferred to the next stage through a conveyor belt. The final product within the following specifications is transported to the direct reduced iron production unit:

Pelletizing Plant
Capacity:
3,400,000 TPY
Output:
Iron Pellet,size: 9-16mm,Iron assay: 66%,CCS: 300kg/pellet
Main Processes & Equipment:
Optimum Blain No. HPGR
Batching & Mixing
Balling Pelletizing Disks
Travelling Grate
Rotary Kiln Allis Chalmers Method
Annular Cooler
img-1
img-2
img-3
img-4